step1


Step 1: work permit and legal documents

 

To design is the first step for having an ideal pool. Please note that the pool designing quality is not just for heating pool's water or it's water clearance, but in that water with a clear appearance, one can do molecular culture and see very bad results. So, a filtration and disinfection system accurate operation is just determined by water molecular culture.

 

By much studies and researches in PadideEstakhr, we use update knowledge in our designs

 

In the following, we introduce documents of designing section, helping us plan and implement a different and big projects.

 

To watch PadideEstakhr projects click on the link:

 

PadidehEstakhr projects

 

 

 

Of two work permit by mechanical facility union and pipe and joints union

 

PadidehEstakhr designing unit is trustworthy of Shiraz big water park councilor

 

Yasuj water park designing and implementing:

 

 

 

On designing, the water park is of the most complexities due to much diversity in filtration, pumping and disinfection systems

 

Participating in the big pools designing and maintenance course in Munster, Germany, 2010.

 

 

 

Training course of salt Chlorination in Spain, 2017.

 

Salt Chlorination is very efficient solution to disinfect pools, whoseaccurate selecting and implementing require knowledge and experience, so, we participated in an engineering course in Spain and visiting conducted projects and participating at workshops we could setup and implement some successful projects in Iran.

 

 

Comments